Mini Cordwood Build: Building the Clay Sifter

Building
3

We need a lot of clay and gravel for the cordwood build.  We are going to have to collect and sift through all the clay we need to not only get the smoother clay, but to also get all the gravel out of the caly so we can use that as well.  We’re going to need a big sifter.

I have plenty of roundwood laying around, so that is what I will be building the sifter with.  I will also need some screws, 1/2″ wire fencing (hardware mesh), and some wood staples.  The whole thing cost less than $20.

Step 1: I got a small tree, about half inch diameter and cut the four sides of the sifter out of that.  I want my sifter to rest on top of my wheelbarrow, so my dimenions match the wheelbarrow top.  I cut 2 sides at 2′ and two sides at 3′.

 

Step 2: Notch the ends of the logs to make the corners.  I cut my notches with the chainsaw and a chisel.

Notched pieces in place, one log is turned to show the notches

Step 3: Line up the four corners and pre drill the holes for the screws.  If you don’t, the log ends may split.

Step 4: Screw the pieces all together.

Complete frame with fancing in place

Step 5: Stretch the fencing across the frame and staple in to place.  A screwdriver used for leverage to tighten the fencing onto the frame works well.  I forgot to get a picture of this, but basically you put the screwdriver through the mesh near the unstapled end.  If you then push the flat end of the screwdriver against the wood you can use the handle as the leverage to pull the fencing taught.  Then staple it in place.  You can add some wide headed screws to really hold the fencing in place.

Stapled underside

Step 6: Sift!

Wet clay is less than ideal for sifting
Beautifully sifted, with gravel left over

Here are some more sifters:

Countryside Network

House Alive

Build Naturally

Pure Living for Life

Share This:

3 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Building
Fully Flattened

The first step for the addition is to flatten the area, as I have mentioned before. However, the steps are overlapping here for us a lot. There are a few steps that are close to done as well, but the flattening is all done. There were stumps and Rocks all …

Building
Stumps and Rocks

The first area that I will be adding will be the water room. The rain barrels will be set up here, and so the sink will be nearby, and the next room over will be the bathroom. They need to be close for water access and for grey water drainage. …

Building
Getting to Digging

The ground is just thawed and dry enough to get in some digging on the sunnier days. I have a lot of digging ahead of me, and I have to take all the time I can get. An addition will be put on the house, including an up grade to …