Additon Step 2: Make a Flat Spot

Building

This is the second area I am flattening out for the addition. The other side was put up in a hurry, so I forgot to take pictures.

Obstacle 1 on this side is the tree stump.

Obstacle 2 is the gap alongside the house. I stacked rocks to form a wall.

Obstacle 3 was solid steps. I had to roll rocks to the spot so I could have the perfect steps.

And the biggest obstacle is getting rocks out of the way.

I did end up with plenty of rocks to build the walls.

Share This:

No Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Outdoor Building
Addition Step 1: Move Annoying Boulder

Step 1 for the new addition is to move an annoying boulder that is sticking out of the ground at a 45degree angle.  I had an idea that the rock was flat, so I figured I would give it a go.  First thing I had to do was to dig …

Building
6
Change in Plans…Again…

We have been hard at work on the cordwood house for a couple a months now.  Although it appears to me as though we have hardly been working.  Everything is moving painfully slowly and outside situations keep putting a hold on the the build for one annoying reason or another.  …

Building
Cordwood Build: Take 2

We are back to work at the cordwood house.  The first step was to get a work station set up and a path to it.           This will be the area we sort rocks and clay and process the trees. I could show you a million …