Cordwood Build: Take 2

Building

We are back to work at the cordwood house.  The first step was to get a work station set up and a path to it.

 

 

 

 

 

This will be the area we sort rocks and clay and process the trees.

I could show you a million pictures of the boulders that were in the way, but they all look about the same.

There are a bunch of Hemlock throughout the area.  They will but cut and used for posts for the house.  (Not that dead one.)

 

 

 

 

 

 

 

Step 2 will be to start sorting out rocks, clay, and wood.  All will be used for materials for the house or the gardens.

 

 

 

 

 

 

 

Meanwhile, the potatoes are getting out of control…

 

 

 

 

Share This:

No Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Building
Getting to Digging

The ground is just thawed and dry enough to get in some digging on the sunnier days. I have a lot of digging ahead of me, and I have to take all the time I can get. An addition will be put on the house, including an up grade to …

Building
2
Additon Step 2: Make a Flat Spot

This is the second area I am flattening out for the addition. The other side was put up in a hurry, so I forgot to take pictures. Obstacle 1 on this side is the tree stump. Obstacle 2 is the gap alongside the house. I stacked rocks to form a …

Building
6
Change in Plans…Again…

We have been hard at work on the cordwood house for a couple a months now.  Although it appears to me as though we have hardly been working.  Everything is moving painfully slowly and outside situations keep putting a hold on the the build for one annoying reason or another.  …